Building
The Southside
11 Heung Yip Road
Wong Chuk Hang
Year Built
2023
Size Range
452-813ft²
Building Size
642 Units
Total 4 Blocks
Type
High Rise
Located at The Southside Phase 2B Blue Coast, this modern high-rise residential development was completed in 2023 and sits atop the vibrant Southside district of Wong Chuk Hang. Conveniently connected to MTR transport, shopping, dining, and lifestyle attractions, the project offers contemporary urban living on the south side of Hong Kong Island.
The development consists of 4 residential blocks rising up to 30 floors high, offering a total of 642 units. Apartments range from approximately 452 to 813 sq.ft., featuring efficient layouts designed for modern city living. As a newly completed high-rise development, residents enjoy stylish architecture and premium residential facilities. Its prime location provides quick access to Central while being close to beaches, hiking trails, and the Aberdeen waterfront.
22.2470253
114.1672404
18
javascript:void(0)
The Southside
https://jadeland.hk/wp-content/uploads/2026/05/The-Southside-Blue-Coast-2B-Hong-Kong-Renovated-Apartment-For-Rent-Jade-Land-Properties-Hong-Kong-Real-Estate-Agent-768x470.jpeg



