Building
Tavistock II
10A Tregunter Path, Mid-levels Central
Year Built
1999
Size Range
1221-1551ft²
Building Size
98 Units
33 Floors per Block
Total 1 Block
Type
High Rise
Facilities
Gymnasium Children's Play Area 24/7 Security Car Park Swimming Pool Function Room
Tavistock II is a luxury high-rise development built in 1999, and is located on tranquil Tregunter Path. It is the second phase of the Tavistock development. It comprises of a 33-storey tower with 3 units per floor (standard floor). The apartments range in size from 1,265 to 1,551 sq.ft. (saleable). The majority of the apartments come in 3 bedroom 2 bathroom layouts.
Tavistock II is crafted by reputable developer Kerry Properties. The development shares the driveway entrance, swimming pool, and clubhouse facilities of the neighbouring building, Aigburth.
22.2731321
114.1529229
18
javascript:void(0)
Tavistock II
https://jadeland.hk/wp-content/uploads/2021/02/tavistock-ii-10a-tregunter-path-building-image-mid-levels-central-district-hong-kong-properties-for-rent-for-sale-jade-land-properties-real-estate-agent-central-768x455.png